SWTrans has completed the transportation of bridge crane of 35 m. The transportation was performed from Ekaterinburg to Vyksa (Nizhegorodsky region), and took a period of 3 months. 8 voyages were executed, 3 trailers per each.
The bridge crane is combined from 3 parts – 2 semi-bridges and a bogey. In total, 16 semi-bridges and 8 bogeys were transported.
The dimensions of the cargo:
Semi-bridge:
35 x 3,7 x 2,5 m, 40 t.
Bogey:
5 x 3,5 x3 m
As we already mentioned, each non-standard transportation is being accompanied with several complications, which in this particular case were connected with the road itself. Road to Vyksa was generous for problems, as relief there was very complex and not easy to drive through. Despite the state-of the art planning, dimensions of cargo were a limit for every other route except the one taken.